Skip to the project story
ELEKTRON
Try the demo

Plant output dropped?Know why before sending anyone

Elektron is an AI assistant for solar, wind and geothermal plants. It uses Muse to find the real cause and test the fix first.

Try the demo

ELEKTRON Launch film

Fictional fleet · Simulated operations Explore the investigation ↗

Official entry · Meta Global AI Developer Hackathon
  • Meta
  • Baseten
  • Modal
  • Fireworks

We work with electrical engineers and power plants in the Philippines

We keep renewable power plants running on regions across Luzon, Visayas, and Mindanao.

Map of the Philippines with Elektron's eight simulated sites
136MW8 sites · solar, wind, geothermal and hydro
INV-07 · Silangan Solar
322kWexpected 699 kW

Every day, something drops.
And we have to find out why.

A drop like this has three possible causes

A failing inverter

Clouds or rain

A sensor that went quiet

On a chart, they all look the same. Pick one to read the evidence.

Read the evidence

One unit falls behind its neighbors

An inverter turns a solar panel’s electricity into power the grid can use. Here, one inverter is running hot and its controller limits output, while neighboring units keep producing.

Next stepInvestigate this unit

Check temperature, the controller event and neighboring output. Inspect the cooling system before deciding on maintenance.

Open this investigation
Silangan Solar / INV-07Simulated · 13:42 PHT
Actual power322 kW
Expected in this weather699 kW
020040060080012:4212:5713:1313:2713:42
ActualExpectedLast 60 minutes

The simulation confirms a power-limiting event. It does not establish the physical cause of the overheating.

kW describes the rate of power production. Energy is that power accumulated over time.

Guess wrong, and a crew drives hours to a site where nothing is broken.

Every plant becomes a live 3D twin

Powered by NVIDIA SimReady
WTG-0311.8 m/s · 2.4 MW
Silangan Solar12 inverters
Bukal Geothermalcooling towers · powerhouse
ELEKTRON/ Hiraya Renewables /Silangan SolarSimulated · 13:42 PHT

Silangan Solar

Nueva Ecija, Luzon · 12 inverters
Inverter zones · output vs expected
01
02
03
04
05
06
07
08
09
10
11
12
INV-07 output · kW
Equipment inspector
INV-07
Derating
322kW actual
Expected output
699 kW
Internal temperature
74.3 °C
Data quality
Good · current
Thermal derating event
13:15 PHT
Investigate cause

The alert: INV-07 is making half the power of the inverters next to it. Same sun, same panels.

Take it apart in 3D, and find the part that's running hot

74.3 °C inside, output cut to 322 kW.

  • Cooling fans
  • Copper busbars
  • DC capacitors
  • Control board
  • Filter inductors
  • Power module 2 Running hot

Before we send anyone,
we test the fix

Cooling it down for 30 minutes costs 0.156 MWh. The test runs on a copy. Live data stays untouched.

Try a 30-min outage
06:0009:0012:0015:0018:00
Baseline3.832 MWh
With outage3.676 MWh
Difference−0.156 MWh

Not every drop is a fault

3D solar plant in heavy rain
Rain
18 mm/h
Sunlight
−31%
Equipment
normal

Rain drops output too. Muse checks the weather first. Not a fault

INV-04 · output kW

When a sensor goes quiet, Elektron marks it unknown, not zero

  1. Amihan Wind39.6 m/s
  2. Silangan Solar23.5 m/s
  3. Bukal Geothermal13.2 m/s

Above 25 m/s turbines park. Elektron replays the storm and ranks which sites get hit hardest

Simulated storm field · not an observation

At shift change, the next engineer gets the answer, the evidence and the test

Shift handover
SummaryINV-07 localized thermal derating
EvidenceEV-001 · EV-002 · EV-003 · EV-004
What-if30-min outage · −0.156 MWh
Next stepInspect ventilation before dispatch
StatusSimulated · operator review
Open the case file

Muse

Spark for speed. Wonder for depth.

3D twins

Solar, wind and geothermal on one clock

13

read-only tools Muse can call

Deterministic engine

Calculates every number. The model never invents one.

Evidence IDs

Every claim links to its source

EV-001 INV-07 output 322 kW

18

tool calls over 7 rounds

No equipment controls

It advises. People decide.

Muse reasons. The engine calculates. You decide.

Elektron

Official entry · Meta Global AI Developer Hackathon

Built with Muse Code

Investigate the power drop Explore the full workspace